Before you start
Before you begin, make sure:
The inverter is physically installed and powered on
The Fronius Datamanager 2.0 module is installed
All assets (inverter, Fronius Datamanager 2.0) are updated to the latest software version
Step-by-Step Instructions
1. Connect the inverter to the network
Set the IP switch on the Fronius Datamanager 2.0 to position B (DHCP)
Connect an Ethernet cable to the RJ45 port on the Datamanager 2.0
Verify the connection is established by checking the inverter display or its web portal
For network infrastructure requirements and troubleshooting, see Infrastructure requirements for the gateway.
2. Access the inverter settings
Open a web browser and access the inverter's web portal
Log in as Installer
3. Enable communication via Modbus
Navigate to:
Settings → ModbusConfigure the following Modbus settings:
Data output via Modbus:
tcpModbus port:
502SunSpec Model Type:
int + SFString Control Address-Offset:
101Inverter control via Modbus:
yes
Save the Modbus settings
4. Set control priority
Navigate to:
Settings → EVU EditorConfigure the following EVU settings:
Control via Modbus:
priority 1
Save the configuration
5. Discover the inverter in the commissioning wizard
The inverter is now ready for the commissioning wizard. The gateway will scan the network to find available devices, which may take a few minutes. Once complete, the Fronius inverter will appear on the results page.
When the inverter is detected, set the asset type to PV System from the dropdown.
FAQ
Why isn't the inverter appearing in the commissioning wizard?
Check that the IP switch on the Datamanager 2.0 is at position B and the Ethernet cable is connected. Verify Modbus TCP is enabled with the correct settings and "Control via Modbus" is priority 1. Restart the gateway and wait for the network scan to complete.
How do I update the firmware of the inverter?
You can perform the update through the Fronius Solar.web app or the web app. For detailed update instructions, refer to the official Fronius documentation.
What is the Fronius Datamanager 2.0?
It's a communication module in the inverter that provides network connectivity and remote monitoring. It's required for gateway integration.
Can I use the app instead of the web portal?
Yes, you can configure through the app. Check the Fronius Datamanager 2.0 user manual for app setup.
Why must Modbus control be priority 1?
Priority 1 means gateway commands take precedence over the inverter's internal control. Without this, the gateway can't control the inverter effectively.
Supported models
Primo Series
Primo 3.0-1
Primo 3.5-1
Primo 3.6-1
Primo 4.0-1
Primo 4.6-1
Primo 5.0-1
Primo 5.0-1-AUS
Primo 5.0-1-SC
Primo 6.0-1
Primo 8.2-1
Symo Series
Symo 3.0-3-M
Symo 3.0-3-S
Symo 3.7-3-M
Symo 3.7-3-S
Symo 4.5-3-M
Symo 4.5-3-S
Symo 5.0-3-M
Symo 6.0-3-M
Symo 7.0-3-M
Symo 8.2-3-M
Symo 10.0-3-M
Symo 12.5-3-M
Symo 15.0-3-M
Symo 17.5-3-M
Symo 20.0-3-M