a-TroniX - AX Plus

Hybrid Inverter Connection Guide for the a-TroniX AX Plus Series

Written by Timo Streckfuß

Before you start

Before you begin, make sure:

  • The inverter is physically installed and powered on

  • The inverter is updated to the latest software version

  • The PvHub2.0 app is installed on your device


Step-by-Step Instructions

1. Connect the inverter to the network

  1. Connect an Ethernet cable to port G on the inverter

  2. Verify the connection is established by checking the network status in the PvHub2.0 app

image

For network infrastructure requirements and troubleshooting, see Infrastructure requirements for the gateway.

2. Access the inverter settings

  1. Open the PvHub2.0 app

  2. Follow the instructions to complete the inverter setup in the App

3. Plug&Play discovery and configuration

This inverter supports Plug&Play, requiring no manual configuration. It is automatically detected during gateway commissioning and configured with the appropriate settings.

4. Discover the inverter in the commissioning wizard

The inverter is now ready for the commissioning wizard. The gateway will scan the network to find available devices, which may take a few minutes. Once complete, the a-TroniX AX Plus inverter will appear on the results page.

When the inverter is detected, in most cases set the asset type to Hybrid (PV and Battery) from the dropdown.

If you are using the inverter exclusively as a PV inverter, select PV System. If it is used solely as a battery inverter, choose Battery.


Country-specific configurations

Germany

Applies to PV installations exceeding 2 kWp installed after February 24, 2025.

For detailed information refer to §9 EEG (2025) – 60% feed-in limitation

No additional inverter configuration is required. The inverter controls the grid feed-in limit directly (GCP Limit), supporting energy management optimization.

Energy management settings are configured automatically based on the inverter model. No manual changes are needed in the commissioning wizard.


Additional Information

Dual Meter Configuration

The AX Plus inverters support connecting two meters:

  • One for the grid connection point

  • A second for an additional PV system

Important

When using two meters, ensure they do not use the same communication address to prevent conflicts. Refer to the a-TroniX user manual for configuration instructions.


FAQ

Why isn't the inverter appearing in the commissioning wizard?

Check that you completed the inverter setup with no errors in the PvHub2.0 app. Verify all components (data logger, inverter, battery, energy meter) work correctly. Make sure the Ethernet cable is connected to the LAN port. Restart the gateway and wait for the network scan to complete.

How do I update the firmware of the inverter?

You can perform the update directly through the PvHub2.0 app.

For detailed update instructions, refer to the official a-TroniX documentation.


Supported models

  • AX Plus 5kW-3ph

  • AX Plus 6kW-3ph

  • AX Plus 8kW-3ph

  • AX Plus 10kW-3ph

  • AX Plus 12kW-3ph

  • AX Plus 15kW-3ph